Tekno Consultancy teams have been in the wings, awaiting all necessary design works to flow; in order to start working on this much needed care providing facility. Healthcare facilities are treated with care at Tekno Consultancy, and this applies to all our practices on-site and off-site.
Tekno has started construction supervision for this 150- beds paediatric hospital in September 2021, designed by AMPC & JFA Engineering, and financed by UNDP.
The design is an interesting blend of local architecture and modernism. It also demonstrates that climate adaptiveness and sustainability measures can be put into practice yet the building can be cost effective; defying the reputation of sustainable solutions of being costly. Social responsiveness translates in provision of spacious waiting areas, and gender segregation; dealing with it within the cultural context.
Tekno Consultancy has a long history in healthcare design and supervision, dating back to the 1960s.
Check the link below to see some of our major healthcare projects.