Tekno Consultancy provided cleanroom design services for this Arizona Intel Fab. The cleanroom was a design-build project, and Tekno carried out the services with Southland Industries as the Cleanroom Contractor.
Total BUA : 45,000 m2 ; the total project cost was $900,000,000.